top of page

Driftwood Pond Feasibility Study

  • Marian
  • May 25, 2023
  • 1 min read

Updated: Aug 28, 2023

The City of Richmond Hill is undertaking the Driftwood Pond Stormwater Management Facility Feasibility Study to determine the best means of rehabilitating the facility.


Driftwood Pond is not functioning as designed and has been identified for assessment and rehabilitation.


The study will evaluate a range of alternatives to determine the best solution to restore or improve the function of the facility. Multiple field investigations are needed to determine the current condition of the facility.

ree

ree

 
 
bottom of page